Home
About us
What we do
References
Photo gallery
News
Information
Contact Us
IMR Croatia
IMR Munich
IMR South Africa
IMR U.A.E.
IMR Kosovo
Home
References
Photo gallery
Photo gallery
Power plant Kusille in South Africa
Kusile Power plant
Boiler 3, heat treatment of welded joints on 'star distributor'
Boiler 4, Welding of pipe hopper
Lifting of massive steam pipe
Super heater drain station
TIG welding
Unit 3, flue gas duct
Welding joint prepared for heat treatment
Gas pipeline Bjelovar
Placement of gas pipeline pipe into the trench 1
Placement of gas pipeline pipe into the trench 2
Placement of gas pipeline pipe into the trench 3
Placement of gas pipeline pipe into the trench 4
Pre-assembly of gas pipeline DN150 in Bjelovar 1
Workshop - Slavonski Brod
Workshop Slavonski Brod – Pre-assembly of T-pieces Ø1500 for Zagreb city grid 1
Workshop Slavonski Brod – Pre-assembly of T-pieces Ø1500 for Zagreb city grid 2
Workshop Slavonski Brod – Pre-assembly of T-pieces Ø1500 for Zagreb city grid 3
Workshop Slavonski Brod – Pre-assembly of T-pieces Ø1500 for Zagreb city grid 4
Workshop Slavonski Brod – Pre-assembly of pipelines for BE-TO Osijek and Sisak (Thermal plants on biomass) 1
Workshop Slavonski Brod – Pre-assembly of pipelines for BE-TO Osijek and Sisak (Thermal plants on biomass) 2
Workshop Slavonski Brod – Pre-assembly of water pipeline Ø1500 for Zagreb city grid 1
Workshop Slavonski Brod – Pre-assembly of water pipeline Ø1500 for Zagreb city grid 2
Tanker port - Bakar
Loading - unloading arm (telescopic structure with pipeline) for streaming of media from-to tanker 1
Loading - unloading arm (telescopic structure with pipeline) for streaming of media from-to tanker 2
Tanker port BAKAR - bonding bridge with measurement and regulation equipment
Tanker port Bakar – bonding bridges, piers for loading-unloading media 1
Tanker port Bakar – bonding bridges, piers for loading-unloading media 2
VRU unit - RN Rijeka
Installation of process station for absorbent and filters with activate carbon in Rijeka Refinery 1
Installation of process station for absorbent and filters with activate carbon in Rijeka Refinery 2
Installation of process station for absorbent and filters with activate carbon in Rijeka Refinery 3
Installation of tank for absorbent and flame catcher in Rijeka Refinery 1
Installation of tank for absorbent and flame catcher in Rijeka Refinery 2
Vapor recovery unit in Rijeka Refinery 1
Vapor recovery unit in Rijeka Refinery 2
Fire water network
Digging of trenches for the fire water network and placement of protective resistors in Kronospan CRO 1
Digging of trenches for the fire water network and placement of protective resistors in Kronospan CRO 2
Installation of hydrants and valves on the network 1
Installation of hydrants and valves on the network 2
Placement of PHD 400 pipe into the trench 1
Placement of PHD 400 pipe into the trench 2
Placement of PHD 400 pipe into the trench 3
Placement of PHD 400 pipe into the trench 4
INA – Rijeka Refinery
Erection of pipeline for tank cooling and extinguishing
Functional pipeline testing 1
Functional pipeline testing 2
Functional pipeline testing 3
Pipe supports
Pre-assembly of pipes in workshop
Tank cooling and extinguishing pipeline
Tanks for fuel in INA – Rijeka Refinery